The IFC Maintenance Hole (MH) System eliminates inflow & infiltration, minimizes road deterioration, increases sewer capacity & groundwater recharge, provides substantial cost savings and has at least 200% longer life cycle than conventional MH installations. The IFC MH System can be installed on new and existing tapered tops, flat caps and chambers. Numerous municipalities and organizations across Ontario are now specifying and accepting the IFC MH System. Over 2500 IFCs have been installed.
MATERIAL GUARANTEE
• DECAST offers a 25 Year Material Guarantee
IFC DUCTILE IRON FRAME
• 220% stronger than the conventional cast iron frame
• Ductile iron can bend, cast iron is brittle and breaks
• Fast & accurate adjustments, up to 200mm (8in)
PRECAST ADJUSTMENT UNITS
• 200% stronger concrete mix design than standard grade rings
• No inflow & infiltration, no joints for frost to penetrate
• Withstands repeated traffic loads, grade rings will break/fail
• 10 sizes in 50mm (2in) increments, up to 550mm (22in)
• For greater accuracy shims are available in 3mm (1/8in) increments
IFC TAPERED TOP / ENGINEERED GROUT
• Grouting bell facilitates solid, monolithic structure
• Grout flows and cures to create an impenetrable joint
• Engineered, high-performance, pre-mixed grout
• Designed for strength and ease of installation
MULTIPLE SOURCING
• Eliminates sole sourcing challenges
• DECAST has manufacture/distribution license agreements with
• Forterra
• Cedar Infrastructure Products
TRAINING & CERTIFICATION PROGRAM
• All contractors installing IFC MH Systems shall complete the program
• Program occurs during an existing IFC project installation
• Offered free of charge by DECAST
• Permits the company to install the IFC system on future projects
• Current list of approved companies is maintained on the IFC website
More information can be found here: www.ifcmhsystem.com
Project Details
Location: OntarioCopyright 2024 DECAST LTD. | Accessibility | All Rights Reserved | (800) 461-5632 Developed by MediaSuite Inc.